Skip to content
Hospitality · New York, NY · 2021

InterContinental Barclay Hotel

Full guest-room and corridor renovation across multiple floors of the historic InterContinental Barclay, delivered on a block-by-block schedule.

Role
General Contractor
Location
New York, NY
Project value
$18M
Duration
14 months
Scope of work

What we delivered.

  • 01Guest room PIP renovation — 300+ keys
  • 02Corridor and elevator lobby refresh
  • 03Bathroom gut and replacement
  • 04FF&E receiving and installation
  • 05Brand-standard compliance sign-off
Challenge

Block schedule compressed to 72 hours per block, with the hotel operating at high occupancy on adjacent floors.

Solution

Pre-staged FF&E in offsite warehouse, dedicated night-shift crew for demolition, and a floor captain for every block.

Gallery

From the field.

3 images
Start a project

Send us the drawings, the PIP, or the FISP report—we'll take it from there.

New York and Florida. Hospitality, healthcare, education, residential, retail, restaurants, commercial, and institutional. We'll tell you if we're the right fit—and if we're not, we'll tell you who is.